Frequently Asked Questions
Solar & BESS FAQs
Answers to the questions we hear most often from residential, commercial, and industrial customers across Marathwada.
About Nankharia Energy
How long has Nankharia Energy been in business?
Nankharia Energy has been a solar EPC integrator since 2008, backed by the 40+ year legacy of the Nankharia Group.
Which areas do you serve?
We serve Chhatrapati Sambhajinagar, Jalna MIDC, Ahmednagar / Ahilyanagar, the Waluj Industrial Area, and the wider Marathwada region of Maharashtra.
What services does Nankharia Energy provide?
End-to-end solar EPC services — consultation, custom engineering, procurement, construction, DISCOM liaison and net-metering approvals, commissioning, and ongoing operations and maintenance (O&M/AMC) — for residential, commercial, industrial, and institutional customers, along with Battery Energy Storage System (BESS) integration.
Design & Installation
How is my solar system designed?
We start with site identification, a feasibility study, and a review of your sanctioned load or contract demand, then prepare a detailed, custom engineering plan. Our array design complies with IEC 62548 standards.
Do you handle net metering and DISCOM approvals?
Yes. We manage DISCOM applications, inspections, and net-metering approvals on your behalf, for both grid-tie and net-metered installations.
Cost & Subsidies
Is government subsidy available for residential solar?
Yes. Residential rooftop systems can be integrated with the PM Surya Ghar Muft Bijli Yojana, which offers government subsidy assistance of up to ₹78,000 along with a 300-units-free-electricity scheme, subject to eligibility. However, the PM SURYAGHAR Scheme will end on 31St March 2027 as per the National Portal of MNRE, Government of India
How much does a solar system cost?
Cost depends on your system size, roof type, and consumer category (residential, commercial, or industrial). Use our online savings calculator for an instant indicative estimate, or request a personalized quote through our RFP form.
Battery Storage (BESS)
Is battery storage (BESS) mandatory for my project?
Under Maharashtra’s Renewable Energy and Energy Storage (REES) Policy, battery storage is mandatory for facilities of 100 kW and above. Below that threshold it isn’t required, but it can still meaningfully reduce your electricity costs.
Maintenance & Support
What support do you provide after installation?
We provide operations and maintenance (O&M) with onsite and remote monitoring, and once your system’s warranty period ends, customized Annual Maintenance Contract (AMC) plans with regular technical checks to keep your plant running at optimum capacity.
How do I get a quote?
Submit a Corporate RFP request or the contact form on our website, call +91-9422201537, or email info@nankharia.com.
Still have a question we haven’t covered?
Ask Us Directly