FAQ

Q1: How much does a 3kW rooftop solar system cost in Chhatrapati Sambhajinagar?


A: A 3kW rooftop solar system from Nankharia Energy costs around ₹2,20,000, inclusive of GST and MSEDCL net-metering liaisoning. This includes six 550Wp or 580Wp solar panels and a 3.4kW solar inverter, fully installed and commissioned. With the central PM Surya Ghar subsidy of ₹78,000, the net cost drops to approximately ₹1,21,500, with a typical payback period of around 2 years.


Kindly note the price shown here here is merely for information purpose, actual cost may vary from time to time. Please get the actual price from our sales team.


Q2: How much does a 5kW rooftop solar system cost?


A: A 5kW single-phase system costs ₹3,10,000 (with 545Wp/550Wp panels) or ₹3,20,000 (with 580Wp panels), both including a 5.4kW solar inverter, GST, and MSEDCL liaisoning. A 5kW three-phase system costs ₹20,000 to ₹30,000 more than the single-phase price. After the ₹78,000 PM Surya Ghar subsidy (capped at this amount for systems above 3kW), net cost is approximately ₹2,32,000–₹2,72,000 depending on configuration.


Q3: How much does a 10kW rooftop solar system cost?


A: A 10kW rooftop solar system costs ₹5,58,000, including eighteen 550Wp panels, a 10kW three-phase inverter, GST, and full MSEDCL net-metering liaisoning. This system size is subsidy-capped at ₹78,000 under PM Surya Ghar, bringing net cost to approximately ₹4,80,000.


Q4: What subsidy is available for rooftop solar in Maharashtra?


A: The central PM Surya Ghar Muft Bijli Yojana subsidy provides ₹30,000/kW for the first 2kW and ₹18,000/kW for the third kW, capped at a maximum of ₹78,000 for any residential system of 3kW or above. This means a 5kW or 10kW system receives the same ₹78,000 as a 3kW system — the subsidy does not scale with size beyond that point.


Q5: What is the payback period for a rooftop solar system in Chhatrapati Sambhajinagar?


A: Payback period for a residential rooftop solar system in Chhatrapati Sambhajinagar typically ranges from 2 to 3.5 years after the PM Surya Ghar subsidy, based on an average residential tariff of ₹14/unit and standard regional generation output. Larger systems and systems installed before claiming the subsidy have a proportionally longer payback window.


Q6: What warranty does Nankharia Energy provide on solar installations?


A: Nankharia Energy provides a 20-year manufacturer warranty on solar panels, a 10-year warranty on solar inverters, and a 5-year warranty on installation workmanship. Service response time is committed within 24 hours for locations within city limits.


Q7: Which solar panel brands does Nankharia Energy install?


A: Nankharia Energy installs panels from Raaj Solar, Waaree, Adani, Zytech, Microsun, and Premier — all Tier 1 / ALMM-listed manufacturers eligible for government subsidy schemes.


Q8: How long does a solar installation take from start to finish?


A: Installation timelines vary by site; systems in the 5kW to 35kW range typically take one to two months from site survey through to final commissioning, including MSEDCL net-metering approval.


Q9: Does Nankharia Energy handle net-metering paperwork with MSEDCL?


A: Yes. Nankharia Energy manages the complete MSEDCL net-metering process end-to-end — from application through to installation of the net meter at the customer’s site — so the customer does not need to handle any DISCOM paperwork directly.


Commercial & Industrial Systems (25kW and Above)


Q10: How is pricing determined for commercial and industrial solar systems (25kW–60kW+)?


A: Commercial and industrial system pricing is determined case-by-case based on site conditions, roof/structure type, distance from the grid connection point, and current component costs, rather than a fixed per-kW rate like residential systems. Contact our sales team for a free site assessment and customized quote.


Q11: What tax incentives are available for commercial and industrial solar in Maharashtra?


A: Unlike residential systems, commercial and industrial solar installations are not eligible for the PM Surya Ghar subsidy. Instead, businesses can claim Accelerated Depreciation under Section 32 of the Income Tax Act — up to 40% of the asset’s value in Year 1 on the Written Down Value (WDV) method, with an additional 20% available for manufacturing and power-generation businesses. This is a tax benefit, not a subsidy, and eligibility depends on your business structure. Please consult your Chartered Accountant for guidance specific to your company.


Q12: How is net metering different for commercial and industrial solar installations?


A: Commercial and industrial net metering follows a different MSEDCL process than residential. Feasibility approval is issued within 7 working days, followed by testing and commissioning within 10 working days, and net meter installation within a further 10 working days. High-tension (11kV and above) consumers have their net meter installed on the HT side of the transformer rather than at the point of use. Nankharia Energy manages this entire DISCOM process end-to-end on your behalf.


Q13: Do commercial and industrial solar panels need to meet different compliance requirements?


A: Yes. As of June 1, 2026, commercial and industrial solar projects in Maharashtra must use panels from the MNRE’s ALMM (Approved List of Models and Manufacturers) List-II. Projects using non-compliant panels risk denial of net metering approval by MSEDCL. Nankharia Energy sources from Tier-1 manufacturers and will confirm current ALMM List-II compliance for your specific project before procurement.


Click here to call us now