Solar Generation Calculator

Solar Generation Calculator

Monthly Output (kWh) & Savings (₹)

Month Generation (kWh) Savings (₹)

Solar Panel Orientation

N S E W

Azimuth: 45° (0° = South)  |  Tilt: 17°  |  Mounting: Landscape

Solar Generation & Payback Data — All 21 Cities

City-specific solar irradiance (GHI) data and payback estimates from Nankharia Energy’s engineering team, based on each city’s actual generation potential — not national averages. Matches every city in the calculator above.

Last updated: July 2026

Annual Solar Generation Yield by City

City Annual Generation (kWh per kW installed) Avg. Daily Yield (units/kW/day)
Ahilyanagar1,4974.10
Akola1,5924.36
Amravati1,5924.36
Bhiwandi1,5324.19
Chandrapur1,5664.29
Chhatrapati Sambhajinagar1,5274.18
Dhule1,5244.18
Jalgaon1,5584.27
Jalna1,5274.18
Kalyan-Dombivli1,5324.19
Kolhapur1,5344.20
Latur1,4684.02
Malegaon1,5304.19
Nanded1,4974.10
Navi Mumbai1,5324.19
Parbhani1,4974.10
Sangli1,5344.20
Solapur1,5614.28
Thane1,5324.19
Ulhasnagar1,5324.19
Vasai-Virar1,5324.19

Based on optimal south-facing panel orientation (20° tilt). Actual output for your specific roof depends on tilt, azimuth, and shading — use the calculator above for a result matched to your exact site. All 21 cities match the calculator’s city selector.

Payback Period by City & System Size

City 3 kW Payback
(before / after subsidy)
5 kW Payback
(before / after subsidy)
10 kW Payback
(before / after subsidy)
Ahilyanagar3.2 / 1.9 yrs3.0 / 2.2 yrs2.7 / 2.3 yrs
Akola3.0 / 1.8 yrs2.8 / 2.1 yrs2.5 / 2.2 yrs
Amravati3.0 / 1.8 yrs2.8 / 2.1 yrs2.5 / 2.2 yrs
Bhiwandi3.1 / 1.9 yrs2.9 / 2.2 yrs2.6 / 2.2 yrs
Chandrapur3.0 / 1.9 yrs2.8 / 2.1 yrs2.6 / 2.2 yrs
Chhatrapati Sambhajinagar3.1 / 1.9 yrs2.9 / 2.2 yrs2.6 / 2.3 yrs
Dhule3.1 / 1.9 yrs2.9 / 2.2 yrs2.6 / 2.3 yrs
Jalgaon3.1 / 1.9 yrs2.8 / 2.1 yrs2.6 / 2.2 yrs
Jalna3.1 / 1.9 yrs2.9 / 2.2 yrs2.6 / 2.3 yrs
Kalyan-Dombivli3.1 / 1.9 yrs2.9 / 2.2 yrs2.6 / 2.2 yrs
Kolhapur3.1 / 1.9 yrs2.9 / 2.2 yrs2.6 / 2.2 yrs
Latur3.2 / 2.0 yrs3.0 / 2.3 yrs2.7 / 2.3 yrs
Malegaon3.1 / 1.9 yrs2.9 / 2.2 yrs2.6 / 2.2 yrs
Nanded3.2 / 1.9 yrs3.0 / 2.2 yrs2.7 / 2.3 yrs
Navi Mumbai3.1 / 1.9 yrs2.9 / 2.2 yrs2.6 / 2.2 yrs
Parbhani3.2 / 1.9 yrs3.0 / 2.2 yrs2.7 / 2.3 yrs
Sangli3.1 / 1.9 yrs2.9 / 2.2 yrs2.6 / 2.2 yrs
Solapur3.0 / 1.9 yrs2.8 / 2.1 yrs2.6 / 2.2 yrs
Thane3.1 / 1.9 yrs2.9 / 2.2 yrs2.6 / 2.2 yrs
Ulhasnagar3.1 / 1.9 yrs2.9 / 2.2 yrs2.6 / 2.2 yrs
Vasai-Virar3.1 / 1.9 yrs2.9 / 2.2 yrs2.6 / 2.2 yrs
Calculation basis: Residential tariff of ₹14/unit. System prices: 3kW ₹1,99,000–₹2,00,000; 5kW (single-phase) ₹3,10,000; 10kW ₹5,58,000 — all inclusive of GST and MSEDCL net-metering liaisoning. PM Surya Ghar central subsidy of ₹78,000 applied where noted (capped at this amount for systems of 3kW and above, regardless of size). Figures are estimates for planning purposes; use the calculator above for a precise result for your property.